We need to shorten the timeout to bound effectively for
computation size. This protects against "too big" repos.
This also protects to some extent against too long lines
if kept to very low values (basically so that grep cannot run out
of memory beforehand).
Docs-PR: forgejo/docs#812
Fix#31271.
When gogit is enabled, `IsObjectExist` calls
`repo.gogitRepo.ResolveRevision`, which is not correct. It's for
checking references not objects, it could work with commit hash since
it's both a valid reference and a commit object, but it doesn't work
with blob objects.
So it causes #31271 because it reports that all blob objects do not
exist.
(cherry picked from commit f4d3120f9d1de6a260a5e625b3ffa6b35a069e9b)
Conflicts:
trivial resolution because go-git support was dropped https://codeberg.org/forgejo/forgejo/pulls/4941
Support compression for Actions logs to save storage space and
bandwidth. Inspired by
https://github.com/go-gitea/gitea/issues/24256#issuecomment-1521153015
The biggest challenge is that the compression format should support
[seekable](https://github.com/facebook/zstd/blob/dev/contrib/seekable_format/zstd_seekable_compression_format.md).
So when users are viewing a part of the log lines, Gitea doesn't need to
download the whole compressed file and decompress it.
That means gzip cannot help here. And I did research, there aren't too
many choices, like bgzip and xz, but I think zstd is the most popular
one. It has an implementation in Golang with
[zstd](https://github.com/klauspost/compress/tree/master/zstd) and
[zstd-seekable-format-go](https://github.com/SaveTheRbtz/zstd-seekable-format-go),
and what is better is that it has good compatibility: a seekable format
zstd file can be read by a regular zstd reader.
This PR introduces a new package `zstd` to combine and wrap the two
packages, to provide a unified and easy-to-use API.
And a new setting `LOG_COMPRESSION` is added to the config, although I
don't see any reason why not to use compression, I think's it's a good
idea to keep the default with `none` to be consistent with old versions.
`LOG_COMPRESSION` takes effect for only new log files, it adds `.zst` as
an extension to the file name, so Gitea can determine if it needs
decompression according to the file name when reading. Old files will
keep the format since it's not worth converting them, as they will be
cleared after #31735.
<img width="541" alt="image"
src="https://github.com/user-attachments/assets/e9598764-a4e0-4b68-8c2b-f769265183c9">
(cherry picked from commit 33cc5837a655ad544b936d4d040ca36d74092588)
Conflicts:
assets/go-licenses.json
go.mod
go.sum
resolved with make tidy
If the assign the pull request review to a team, it did not show the
members of the team in the "requested_reviewers" field, so the field was
null. As a solution, I added the team members to the array.
fix#31764
(cherry picked from commit 94cca8846e7d62c8a295d70c8199d706dfa60e5c)
There is no reason to reject initial dashes in git-grep
expressions... other than the code not supporting it previously.
A new method is introduced to relax the security checks.
- When people click on the logout button, a event is sent to all
browser tabs (actually to a shared worker) to notify them of this
logout. This is done in a blocking fashion, to ensure every registered
channel (which realistically should be one for every user because of the
shared worker) for a user receives this message. While doing this, it
locks the mutex for the eventsource module.
- Codeberg is currently observing a deadlock that's caused by this
blocking behavior, a channel isn't receiving the logout event. We
currently don't have a good theory of why this is being caused. This in
turn is causing that the logout functionality is no longer working and
people no longer receive notifications, unless they refresh the page.
- This patchs makes this message non-blocking and thus making it
consistent with the other messages. We don't see a good reason why this
specific event needs to be blocking and the commit introducing it
doesn't offer a rationale either.
See https://codeberg.org/forgejo/discussions/issues/164 for the
rationale and discussion of this change.
Everything related to the `go-git` dependency is dropped (Only a single
instance is left in a test file to test for an XSS, it requires crafting
an commit that Git itself refuses to craft). `_gogit` files have
been removed entirely, `go:build: !gogit` is removed, `XXX_nogogit.go` files
either have been renamed or had their code being merged into the
`XXX.go` file.
This reverts commit 4ed372af13.
This change from Gitea was not considered by the Forgejo UI team and there is a consensus that it feels like a regression.
The test which was added in that commit is kept and modified to test that reviews can successfully be submitted on closed and merged PRs.
Closesforgejo/design#11
---
Conflict resolution: trivial
Things done differently: Improve localization message, use the paragraph
element instead of the div element, fix passing this variable to the
template and add a integration test
(cherry picked from commit 9633f336c87947dc7d2a5e76077a10699ba5e50d)